Power shutdown

<strong>Power shutdown</strong>

JAMMU, SEPTEMBER 17: Chief Engineer (Distribution), JPDCL, Jammu has informed that the power supply to SawanChak, Bhagthali, Hatlimorh, Patel Nagar, Kalibari and adjoining areas shall remain affected on September 18 from 8 am to 11 am.

Similarly, the power supply to Billawar, Mandali, Phinter, Parnalla, Baggan and adjoining areas shall remain affected on September 18 from 9 am to 2 pm.

Likewise, the power supply to Industrial area Bari Brahmana and adjoining areas shall remain affected on September 18 from 8 am to 10 am.

Similarly, the power supply to Parts of Trikuta Nagar, Vikram Chowk, Gandhi Nagar, Police Line Jammu University, Bahu Plaza, Parts of Trikuta Nagar, Gandhi Nagar, Balmiki Colony, Vaishnovi Dham, RBI, Div Com Office and adjoining areas shall remain affected on September 18 from 7 am to 11 am.

Likewise, the power supply to Industrial Area of SIDCO Bari Brahmana shall remain affected on September 18 from 6 am to 11.30 am.

Similarly, the power supply to some areas of Changran and HatliMorh shall remain affected on September 18 from 8 am to 2 pm.

Likewise, the power supply to Patoli Brahmana, Domana, Barnai, Purkhoo, Mishriwala, Baba Talab, ShamachakGurhaSinghu, Batera, Dabbin, Chorpur, Manyal, Dhramkhu, TirthTalab, GREF, Gumpul, Sua No.1, Garkhal, Gharota, Ranjan, Navodya, Amb, Vidyalaya and adjoining areas shall remain affected on September 18 from 7 am to 12 noon.

Similarly, the power supply to Dogra Hall, Rehari, Resham Ghar Colony, Bus Stand, Jewel Hari Market, Kanak Mandi, SMGS Hospital, Pacca Danga, Parade, New Sectt. and adjoining areas shall remain affected on September 18 from 7 am to 12 noon.

Meanwhile, the Superintending Engineer (Distribution), JPDCL O&M Circle, Kathua has informed that the power supply to Nagri, Airma Morh and adjoining areas shall remain affected on September 19, 21 and 23 from 7 am to 12 noon.

Similarly, the power supply to Industry shall remain affected on September 19 from 7 am to 12 noon.

Likewise, the power supply to Arazi, Agriculture Farm, Chowata area, Trilokan di Chapri, Thalore Mandi, Hari Singh Chowk, Dansal, Kotli Mandi, Main Bazaar, PHE installations and adjoining areas shall remain affected on September 18 from 10 am to 1 pm.    

CATEGORIES
Share This

COMMENTS

Wordpress (0)
Disqus (0 )